Network Engineering & Design

FiberWirelessUtilityRenewable EnergySubseaData Centers
A typical network, as the design package describes it: the feeder out of the exchange, jointed to the splitter hubs, distribution to multiports, drops to premises, and a tower site on dedicated fiber off the same feeder.

Network Architecture

From the central exchange to distribution hubs, premise drops, and wireless cell sites, our network designs route each connection so it can be built as drawn. Every segment accounts for civil conduits, splice points, and fiber allocation.

  • End-to-end routing from exchange to premise connections
  • Distributed civil conduit and underground pit hierarchy
  • Integrated wireless backhaul coordination along the trunk

Different Networks, Same Engineering Rigor.

Fiber and wireless network design is our core, proven on national-scale programs for more than 13 years. We bring the same engineering rigor and QA to subsea cable, utility and renewable energy, and data center networks, designed to the standards of your country, your industry and your organization.

  1. 01

    Network Planning and Feasibility

    Early route options, desktop studies, and constraint mapping that show where a network can be built, what it will involve, and which route offers the best balance of cost and risk.

  2. 02

    High-Level and Detailed Design

    High-level designs that set the network architecture, followed by detailed designs that specify every route, structure, and connection, ready for permits, procurement, and construction crews.

  3. 03
    Wired

    Fiber Network Design

    Route planning, feeder and distribution design, splice and capacity planning for fiber-to-the-premises, backbone, and backhaul networks, designed to operator standards and local authority requirements.

  4. 04
    Wireless

    Wireless Network Design

    Site layouts, equipment and antenna configurations, and fiber or microwave backhaul for new sites and upgrades, coordinated with structural checks so every change fits the site.

  5. 05
    Subsea Cables

    Subsea Terrestrial Design

    Cable landing, shore-end, and terrestrial backhaul routes connecting landing stations to points of presence and data centers, coordinated with marine route engineering through our specialist partners.

  6. 06
    Utilities & Renewable Energy

    Utility and Renewable Energy Networks

    Network extensions, upgrades, and connection design for electric, gas, water, and renewable energy assets, delivered by engineers experienced in utility network design.

  7. 07
    Data Centers

    Data Center Connectivity

    Fiber routes, campus networks, and building entry design that connect data centers to carrier networks, subsea landing stations, and each other, with diverse paths for resilience.

  8. 08

    BOM & BOQ

    Accurate material lists and quantities produced directly from the design, so procurement can order with confidence and construction teams have what they need on site.

  9. 09

    Permit-Ready Documentation

    Design packages prepared to each authority’s requirements, reducing review cycles and helping projects move from design to construction without delay.

  10. 10

    Design Change Management

    Redesigns and updates during construction, tracked through formal revision control, so field changes are reflected in the design and the final record.

Rollouts Move Faster Than Hiring Does.

Network rollouts move quickly, and contractors find it difficult to resource them with an in-house team — the hiring cycle is long and the expertise is scarce. By the time a new hire is productive, the program has moved on.

Wizzio draws on an established team of 200+ engineers, designers and drafters, working dual-shore, with onshore project leadership and offshore design production. We mobilize quickly, scale up for the peak, and scale back down when it passes. No recruitment lead time, no notice periods and no redundancy costs.

A Network Is Only as Good as Its Record

Designs are drawn in one system. Built in another. Documented in a third, months later, by someone who was not there. Every handoff is a chance for the record and the asset to disagree — and disagreement is what costs money on the next program.

  • 01

    Design That Cannot Be Built as Drawn

    Network routes and building services are coordinated separately, so conflicts surface on site, when the cost of resolving them is highest.

  • 02

    As-Builts That Arrive Too Late to Matter

    Documentation trails construction by months. By the time it lands, the next augmentation has already been scoped from stale data.

  • 03

    Manual QA That Does Not Scale

    Checking thousands of design packages by inspection alone is slow, inconsistent, and the first process to be cut when a program runs behind schedule.

  • 04

    Four Vendors, Four Versions of the Truth

    Design, drafting, construction and modeling split across suppliers leaves no single party accountable for the record as a whole.

Connect With Our Engineering Leadership.