Network Engineering & Design
Network Architecture
From the central exchange to distribution hubs, premise drops, and wireless cell sites, our network designs route each connection so it can be built as drawn. Every segment accounts for civil conduits, splice points, and fiber allocation.
- End-to-end routing from exchange to premise connections
- Distributed civil conduit and underground pit hierarchy
- Integrated wireless backhaul coordination along the trunk
Different Networks, Same Engineering Rigor.
Fiber and wireless network design is our core, proven on national-scale programs for more than 13 years. We bring the same engineering rigor and QA to subsea cable, utility and renewable energy, and data center networks, designed to the standards of your country, your industry and your organization.
- 01
Network Planning and Feasibility
Early route options, desktop studies, and constraint mapping that show where a network can be built, what it will involve, and which route offers the best balance of cost and risk.
- 02
High-Level and Detailed Design
High-level designs that set the network architecture, followed by detailed designs that specify every route, structure, and connection, ready for permits, procurement, and construction crews.
- 03Wired
Fiber Network Design
Route planning, feeder and distribution design, splice and capacity planning for fiber-to-the-premises, backbone, and backhaul networks, designed to operator standards and local authority requirements.
- 04Wireless
Wireless Network Design
Site layouts, equipment and antenna configurations, and fiber or microwave backhaul for new sites and upgrades, coordinated with structural checks so every change fits the site.
- 05Subsea Cables
Subsea Terrestrial Design
Cable landing, shore-end, and terrestrial backhaul routes connecting landing stations to points of presence and data centers, coordinated with marine route engineering through our specialist partners.
- 06Utilities & Renewable Energy
Utility and Renewable Energy Networks
Network extensions, upgrades, and connection design for electric, gas, water, and renewable energy assets, delivered by engineers experienced in utility network design.
- 07Data Centers
Data Center Connectivity
Fiber routes, campus networks, and building entry design that connect data centers to carrier networks, subsea landing stations, and each other, with diverse paths for resilience.
- 08
BOM & BOQ
Accurate material lists and quantities produced directly from the design, so procurement can order with confidence and construction teams have what they need on site.
- 09
Permit-Ready Documentation
Design packages prepared to each authority’s requirements, reducing review cycles and helping projects move from design to construction without delay.
- 10
Design Change Management
Redesigns and updates during construction, tracked through formal revision control, so field changes are reflected in the design and the final record.
Rollouts Move Faster Than Hiring Does.
Network rollouts move quickly, and contractors find it difficult to resource them with an in-house team — the hiring cycle is long and the expertise is scarce. By the time a new hire is productive, the program has moved on.
Wizzio draws on an established team of 200+ engineers, designers and drafters, working dual-shore, with onshore project leadership and offshore design production. We mobilize quickly, scale up for the peak, and scale back down when it passes. No recruitment lead time, no notice periods and no redundancy costs.
A Network Is Only as Good as Its Record
Designs are drawn in one system. Built in another. Documented in a third, months later, by someone who was not there. Every handoff is a chance for the record and the asset to disagree — and disagreement is what costs money on the next program.
- 01
Design That Cannot Be Built as Drawn
Network routes and building services are coordinated separately, so conflicts surface on site, when the cost of resolving them is highest.
- 02
As-Builts That Arrive Too Late to Matter
Documentation trails construction by months. By the time it lands, the next augmentation has already been scoped from stale data.
- 03
Manual QA That Does Not Scale
Checking thousands of design packages by inspection alone is slow, inconsistent, and the first process to be cut when a program runs behind schedule.
- 04
Four Vendors, Four Versions of the Truth
Design, drafting, construction and modeling split across suppliers leaves no single party accountable for the record as a whole.
Who We Partner With
For the teams who run rollouts, and the teams who deliver them.